Foul water, rainwater, wastewater treatment, and building over sewers
10 articles
Requirements for foul water drainage systems in UK buildings under Approved Document H, including pipe sizes, gradients, and connections.
Requirements for rainwater disposal, surface water drainage, and sustainable drainage systems under Approved Document H3.
Requirements and procedures for building over or within 3 metres of public sewers.
Requirements for off-mains drainage including septic tanks and package sewage treatment plants under Approved Document H2.
Requirements for testing below-ground drainage systems and the Building Control inspection process.
Requirements for inspection chambers, manholes, and access points in drainage systems.
Requirements for grease management in commercial kitchen drainage.
When pumped drainage is needed and the requirements for basement and below-ground installations.
Using reed beds and constructed wetlands for sewage treatment in rural properties.
How to design a soakaway and carry out percolation tests to BRE Digest 365.